whilst the renovation started some months earlier with the extraction of majority of the interior of the house (videos 1F and 2F), the fact that some aspects of construction has taken place for us means that the renovation project has really begun, albeit being closure of the openings of original fireplaces at ground floor level.

we did think about keeping both fireplaces and restoring them providing key features of the house However, given the size of both fireplaces and the redesign of the internal layout we decided that the removal of both fireplaces was the better option


Recent Entries

The Start Of The Renovation

whilst the renovation started some months earlier with the extraction of majority of the interior of the house (videos 1F and 2F), the fact that some aspects of construction has taken place for us means that the renovation project has really begun, albeit being closure of the openings of...

3 Weeks

We travelled back to England for a 3 week period before returning to Italy and in that short time the renovation project had begun.  Looking at the building rubble outside the house we felt a little trepidation as to what the inside would look like.  The house had been cleared, floor...

Before Renovation

Once we had completed the purchase of the property we commissioned the services of Alessandro Rizzi an architect recommended to us by Gemma (Gemma Immobiliare). A couple of months post purchase we agreed the plans with the architect and then they were submitted to the local Comune for...